View Single Post
Old 10-18-2007, 07:03 PM   #6 (permalink)
quinteros235
Disneyland Freakazoid!
 
quinteros235's Avatar
 

Join Date: Jun 2006
Location: Somewhere in my own dream world
Posts: 220
My Mood:
Default

Quote:
Originally Posted by ryguy222 View Post
Well I last rode it, when rockin' was going, but how the heck do you change wear and tear from 27 months in two days? To maintain the ride going, they have to replace the wheels every once and a while anyway. And steel tracks shouldn't make the wheels squeak. It doesn't on any outdoor coaster I've been on. But like I said they have to change the wheels every so often, and I'm pretty sure coasters don't have axels that go across the entire train. I know they replace the wheels because at Magic Music days, we had to get from the music building behind toontown, up to the stage next to the castle. And we went past the Train shed on BTMRR, and there were new packs of wheels and a bucket with old wheels in it. If they change em' that often on btmrr then they probably do the same on Space Mountain. Plus how could they fix that much stuff in two days? Yes they probably could fix the audio but idk about anything else.
Well, they have two days. That means that have about 48 hours to refurbish it if they don't screw around or anything like that. Hey...maybe they might add the effects Hong Kong Space Mountain has that we don't (i.e. a Hyperspeed Tunnel and some glowing planets)! Maybe they can get the asteriod to work!

Ah, who am I kidding?
__________________
Check out my fanfictions!
http://www.fanfiction.net/~narutofreak14
quinteros235 is offline   Reply With Quote
 
Page generated in 0.09621 seconds with 17 queries