View Single Post
Old 10-18-2007, 05:27 PM   #5 (permalink)
ryguy222
"Merry Christmas!"
 
ryguy222's Avatar
 

Join Date: Sep 2005
Location: AZ
Posts: 3,195
My Mood:
Send a message via AIM to ryguy222 Send a message via MSN to ryguy222
Default

Well I last rode it, when rockin' was going, but how the heck do you change wear and tear from 27 months in two days? To maintain the ride going, they have to replace the wheels every once and a while anyway. And steel tracks shouldn't make the wheels squeak. It doesn't on any outdoor coaster I've been on. But like I said they have to change the wheels every so often, and I'm pretty sure coasters don't have axels that go across the entire train. I know they replace the wheels because at Magic Music days, we had to get from the music building behind toontown, up to the stage next to the castle. And we went past the Train shed on BTMRR, and there were new packs of wheels and a bucket with old wheels in it. If they change em' that often on btmrr then they probably do the same on Space Mountain. Plus how could they fix that much stuff in two days? Yes they probably could fix the audio but idk about anything else.
__________________
-Ryguy222
My Countdown Counting down to: Graduation!
133 days 14 hours 37 minutes
ryguy222 is offline   Reply With Quote
 
Page generated in 0.09722 seconds with 17 queries