^doing it REALLY underground would cause some space issues, since the tunnels are only as big as the coaster will need. I'll just make the ride above ground, but make it have the feeling of being below.
btw, I'm like 1/3 of the way done with the on-ride soundtrack. I think it will be easier to time the ride to the soundtrack rather than make a soundtrack timed to the ride. I'd upload it to my site, but dial-up isn't a very fast connection, you know! lol
Anywho, pics will come soon I hope. I'm almost done with a suitable facade. Trying to make the entire thing EXACTLY the way Disneyfreak made it isn't a quick process... :D
__________________
Number of times on  : 1 (last voyage of July 4th, 2007)
Legend of the Lost Army:UNDER CONSTRUCTION
(Credit goes to Disneyfreak59 for the idea)
Please visit my website HERE (I made for my friend ha ha)
|